Wednesday, July 3, 2019

130 MLD  MADEGAON WTP OF NIRMAL DISTRICT-DESIGN CONSIDERATIONS


Rural Population in 2011 526282
Urban Population in 2011 205593
Growth Facor for Rural Areas 0.80%
Growth Facor for Urban Areas 2%
Prospective Rural Population(2033) 627119
Prospective Urban Population(2033) 317843
WTPs are designed for Prospective Year
Prospective Rural Water Demand  62.72 MLD
Prospective Urban Water Demand 44.26 MLD Given by PH Department
Industrial Demand(@10%) 10.70 MLD
Total Requirement 117.68 MLD
Usually in  CLF about 3% losses and in Back washing of filters about 2% losses occur.So to compensate these losses we take excess 2%
Revised requirement after considering Losses 120.03 MLD
Although Pumps for for 22 Hours filters  work 24 Hours out of which 30 Minutes are used for back washing Hence 128.22 MLD Revised Demand
Say 130 MLD
Rural Population in 2011 526282
Urban Population in 2011 205593
Growth Facor for Rural Areas 0.80%
Growth Facor for Urban Areas 2%
Prospective Rural Population(2033) 627119
Prospective Urban Population(2033) 317843
WTPs are designed for Prospective Year
Prospective Rural Water Demand  62.72 MLD
Prospective Urban Water Demand 44.26 MLD Given by PH Department
Industrial Demand(@10%) 10.70 MLD
Total Requirement 117.68 MLD
Usually in  CLF about 3% losses and in Back washing of filters about 2% losses occur.So to compensate these losses we take excess 2%
Revised requirement after considering Losses 120.03 MLD
Although Pumps for for 22 Hours filters  work 24 Hours out of which 30 Minutes are used for back washing Hence 128.22 MLD Revised Demand
Say 130 MLD