50 MLD WTP at Bhainsa Design Considerations
| Rural Population in 2011 | 251755 | ||
| Urban Population in 2011 | 205593 | ||
| Growth Facor for Rural Areas | 0.80% | ||
| Growth Facor for Urban Areas | 2% | ||
| Prospective Rural Population(2033) | 299992 | ||
| Prospective Urban Population(2033) | 317843 | ||
| WTPs are designed for Prospective Year | |||
| Prospective Rural Water Demand | 30.00 | MLD | |
| Prospective Urban Water Demand | 12.00 | MLD | Given by PH Department |
| Industrial Demand(@10%) | 4.20 | MLD | |
| Total Requirement | 46.20 | MLD | |
| Usually in CLF about 3% losses and in Back washing of filters about 2% losses occur.So to compensate these losses we take excess 2% | |||
| Revised requirement after considering Losses | 47.12 | MLD | |
| Although Pumps for for 22 Hours filters work 24 Hours out of which 30 Minutes are used for back washing Hence | 50.34 | MLD | Revised Demand |
| Say | 50 MLD | ||
130 MLD MADEGAON WTP OF NIRMAL DISTRICT-DESIGN CONSIDERATIONS
| Rural Population in 2011 | 526282 | ||
| Urban Population in 2011 | 205593 | ||
| Growth Facor for Rural Areas | 0.80% | ||
| Growth Facor for Urban Areas | 2% | ||
| Prospective Rural Population(2033) | 627119 | ||
| Prospective Urban Population(2033) | 317843 | ||
| WTPs are designed for Prospective Year | |||
| Prospective Rural Water Demand | 62.72 | MLD | |
| Prospective Urban Water Demand | 44.26 | MLD | Given by PH Department |
| Industrial Demand(@10%) | 10.70 | MLD | |
| Total Requirement | 117.68 | MLD | |
| Usually in CLF about 3% losses and in Back washing of filters about 2% losses occur.So to compensate these losses we take excess 2% | |||
| Revised requirement after considering Losses | 120.03 | MLD | |
| Although Pumps for for 22 Hours filters work 24 Hours out of which 30 Minutes are used for back washing Hence | 128.22 | MLD | Revised Demand |
| Say | 130 MLD | ||
| Rural Population in 2011 | 526282 | ||
| Urban Population in 2011 | 205593 | ||
| Growth Facor for Rural Areas | 0.80% | ||
| Growth Facor for Urban Areas | 2% | ||
| Prospective Rural Population(2033) | 627119 | ||
| Prospective Urban Population(2033) | 317843 | ||
| WTPs are designed for Prospective Year | |||
| Prospective Rural Water Demand | 62.72 | MLD | |
| Prospective Urban Water Demand | 44.26 | MLD | Given by PH Department |
| Industrial Demand(@10%) | 10.70 | MLD | |
| Total Requirement | 117.68 | MLD | |
| Usually in CLF about 3% losses and in Back washing of filters about 2% losses occur.So to compensate these losses we take excess 2% | |||
| Revised requirement after considering Losses | 120.03 | MLD | |
| Although Pumps for for 22 Hours filters work 24 Hours out of which 30 Minutes are used for back washing Hence | 128.22 | MLD | Revised Demand |
| Say | 130 MLD | ||
Monday, June 17, 2019
SALARY CALCULATION WITH IR
Lts say your salary at present as
follows
Basic Pay:40270
DA@27.248%-10973
HRA@14.5%-5839
Total Gross Pay-57082
So if IR Declared is X% then
additional amount given in addition to every month salary is X% of Basic Pay
That is if IR is 27%
Then additional pay for every
month=0.27*40270=10873
Revised Total Pay every
Month=57082+10873=67955/-
Tuesday, February 26, 2019
Procedure for calculating Price Variation For POL(Petrolium,Oil and Lubricants):
Ref:
Ref:
3)GO MS No.94 TR&B(RI)
Department,Dated:28.02.2006
In Reference 1st Price variation for POL was first given and its value is
Further reference 4th cited the coefficient 0.85 replaced by 1
In the forumlae "R",should exclude seinorage charges,VAR and all other overhead charges.
In contractor Profit of 13.615 over head charges are included ,these should be deducted while making payments.There is not break up for this avaliable as of now .so it may be considered as 5%.
Further through in the reference 2nd cited above ,the value of "Fo" should be the prie of POL in the detailed estimate or 28 days before closing date of submission of bids whichever is advantageous to the department.
Example: Click This Link
In contractor Profit of 13.615 over head charges are included ,these should be deducted while making payments.There is not break up for this avaliable as of now .so it may be considered as 5%.
Further through in the reference 2nd cited above ,the value of "Fo" should be the prie of POL in the detailed estimate or 28 days before closing date of submission of bids whichever is advantageous to the department.
Example: Click This Link