Design Periods Considered:
1.Intake well,Transmission and Distribution Systems-Ultimate
Year
2.Sumps,Balancing reservoirs,Service reservoirs,Pumpsets and
water treatment plants-Prospective Year
Above Design periods are mentioned in CPHEEO Manual.
Above Design periods are mentioned in CPHEEO Manual.
Detention Periods Considered:
1.For Sumps at Headworks---2.5 Hours(150 Minutes)
2.For Sumps at IPS-4 Hours(240 Minutes)
3.For Balancing Reservoirs-30 Minutes
4.For Service reservoirs-50% of daily demand.
Example of Design of sump capacity:
Sump Location:Babuldhole
Serves few no of habitations of having population(2011)-114115
From above sumps are designed for prospective population hence
2033 Population-=114115*(1.008^22)=135979.813=135980
Prespective Demand in LPM=135980*(100)/(22*60)=10301.51=10302(22
Hours design)
Sump detention period=4 hours=240 Minutes(IPS)
Sump capacity required=240*10302=2472480=2473 KL
Hence provide=2500 KL