Tuesday, February 5, 2019

Headworks Sump Design


Design of Headworks Sump:

Kaddem Headworks Sump-
2011 Population-167570
2018 Population=16750*(1.008^7)=17710.81=17711
Sumps are designed for 15 Years i.e. 2033
2033 Population=199677
Prospective Water Demand=100 LPCD*199677=19967700 Liters/Day
Designed for 22 Hours
Therefore=19967700/(22*60)=15127 LPM
Hence,Prospective Population Kaddem Headworks Serves-15127 LPM
Detention time for headworks sump=2.5 Hours=150 Minutes
Therefore Sump capacity required=15127*150=2269050=2269 KL
Provide sump capacity of 2300 KL